2024 BMW M3 CS
$134,800

Chicago Motor Cars


27 W 110 North Ave
West Chicago, IL 60185


630-221-1800

Sales Department

www.chicagomotorcars.com


View Dealers Inventory

2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS
2024 BMW M3 CS 2024 BMW M3 CS

First Name

Your Last Name

Email Address

Your Phone

Your Message

Car Details:

Sellers Notes

Seller Notes


https://www.chicagomotorcars.com/

2024 BMW M3 CS Coupe

Frozen Solid White Exterior over Full Leather Merino Anthracite Interior

*ONLY 4K MILES*
*RARE "CS" MODEL*
*M CARBON EXTERIOR*
*M CARBON FIBER BUCKET SEATS*
*543HP 3.0L TWIN-TURBO I6 ENGINE*
*FROZEN ISLE OF MAN GREEN METALLIC*
*CARBON CERAMIC HIGH-PERFORMANCE BRAKES*
*HIGH-PERFORMANCE TRACK FOCUSED "M3 CS" MODEL*
FACTORY OPTIONS INCLUDE:
M Carbon Ceramic Brakes (Originally $8,500)
Frozen Solid White Paint (Originally $4,500)
Carbon Fiber Trim (N/C)
Heated Front Seats (N/C)
Shadowline Exterior (N/C)
Anthracite Headliner (N/C)
M Drive Professional (N/C)
Yellow Front Headlights (N/C)
Adaptive M Suspension (N/C)
M Carbon Bucket Seats (N/C)
M Front End Strut Brace (N/C)
M Carbon Exterior Package (N/C)
VEHICLE HIGHLIGHTS:
3.0 Liter Twin-Turbo 6-Cylinder
-543 Horsepower-
-479 lb/ft of Torque-
All Wheel Drive
8-Speed Automatic Transmission
19" Front / 20" Rear 827 M Wheels
EXTERIOR HIGHLIGHTS:
LED Rear Taillights
M Sport Differential
Red Grille Outlining
Adaptive M Suspension
Carbon Fiber Roof Panel
Carbon Fiber Rear Spoiler
Carbon Fiber Front Splitter
Carbon Fiber Rear Diffuser
Active Blind Spot Detection
Rear View Parking Camera
Rear Trunk "M3 CS" Badge
Brake Calipers Painted Gold
Carbon Fiber Front Grille Inserts
Side Skirts in Gloss Black Contrast
Front Side Fenders "M3 CS" Badge
Carbon Ceramic High-Performance Brakes
LED Automatic Adaptive Leveling Headlights
Dual Rear M Sport Quad-Tip Exhaust System
Carbon Fiber Front Hood w/Exposed Carbon Inserts
Power Adjustable Folding & Heated Carbon Fiber Exterior Mirrors
Yellow LED Automatic Daytime Running Lights Specific to "CS" Model
INTERIOR HIGHLIGHTS:
Live Cockpit Pro
M Drive Professional
Red Contrast Stitching
Wireless Charging Pad
Driver Head-Up Display
Carbon Fiber Interior Trim
Bluetooth Wireless Connectivity
Illuminated "CS" Logos on Seats
Full Digital Driver Display Cluster
Red Contrast Leather Inserts on Seats
Adjustable Driving Modes & Suspension
Center Console Entertainment Control Dial
Full Black / Red Leather Interior Upholstery
"CS" Logo Embroidered on Center Console
Harman Kardon Surround Sound Audio System
Multifunction Entertainment Touch Display Screen
Power Adjustable M Sport Carbon Fiber Bucket Seats
Multifunction Suede Wrapped / Carbon Trim Steering Wheel

VEHICLE HISTORY:
RARE BMW!
Only 4K Miles!
Tons of Carbon Fiber!
Carbon Ceramic Brakes!
Frozen Solid White Paint!
High-Performance Track Focused M3 "CS" Model!


INCLUDES:
*Owners Manual*
*Carpeted Floor Mats*
*Two Master Remote Keys*

********************
FOLLOW US ONLINE!


FOLLOW US ON FACEBOOK


FOLLOW US ON INSTAGRAM


FOLLOW US ON YOUTUBE


FOLLOW US ON TWITTER


WE FINANCE!
WE CAN TAILOR FINANCING TO MEET YOUR NEEDS!
INCLUDING LONG-TERM FINANCING OPTIONS!


WE CAN SHIP YOUR CAR WORLDWIDE!
CONTACT US FOR DETAILS!


CALL US AT
+1 (630) 221-1800

Please remember, every one of our cars has been enjoyed by their original owners, and these are not factory-new cars. This means they have actually been driven, and regardless of the level of care, every car will exhibit some wear-and-tear. Our vehicles are advertised with the current mileage at the time of listing, so mileage at the time of sale may vary due to test drives, transportation for reconditioning, etc. We go above and beyond to be as accurate as possible in our listings and descriptions, but remember, we are still human just like you. Cars leave the factory with unattached accessories (i.e. floor mats, extra keys, owners manuals, headsets, remotes, etc), and while it would be ideal to have all original accessories included with every car, this is not always the case. We will note in our listings any accessories that will be included, and provide a picture within the listing of all accessories. We do all within our power to avoid mistakes or misprints, so if you see any inaccuracy within our listing, we only ask that you bring this to our attention so that we can immediately rectify the information. We cannot be held responsible for any purely accidental inaccuracies. Since our ultimate goal is 100% customer satisfaction, we ask every customer to verify the listed equipment at the time of purchase with their salesperson. Please do not make any assumptions regarding condition or equipment. If you have any questions or concerns, call us at (630) 221-1800 and ask to speak with a sales manager to discuss. We also ask that you not misinterpret anything in this disclaimer, as it is intended to be understood exactly as it is written. We are here to provide only the very best in quality and customer service! All sales must add tax, title, license and $300.00 Illinois Doc fee. Fees may vary by state and county of new vehicle registration. Contact dealer for details.



Close

Send to a Friend

Price

$134,800

Mileage

4,675 MILES

Location

West Chicago, IL

Year

2024

Make

BMW

Model

M3

Body Style

Sedan

Transmission

Automatic

Exterior Color

BMW Individual Frozen Solid White Metallic

Interior Color

Anthracite

Cylinders

6

Drivetrain

AWD

VIN

WBS63AY00RFS08197

Stock#

RFS08197 SW

Dealers Inventory

Price

$79,800

Mileage

29,100

Location

West Chicago, IL

Price

$76,800

Mileage

36,750

Location

West Chicago, IL

Price

$179,800

Mileage

20,444

Location

West Chicago, IL

Price

$39,800

Mileage

27,425

Location

West Chicago, IL

Your link to the world's finest cars